The brief
What the room needed.
The hotel could not close the ballroom. Every intervention had to happen between events, with the room returned to sale by 9am.
The approach
How we engineered it.
We pre-built and burned in racks off site, then worked eleven night shifts. Lighting, audio and video were brought onto one control layer with banquet-specific scenes and a locked operator view.
The outcome
What it does now.
The room reopened with no lost bookings. Setup time for a gala dropped from four hours to ninety minutes, and the banqueting team runs the show without a technician.
Gallery
The room, as built.



Next

