The brief
What the room needed.
The arena needed a continuous ribbon display with no visible seams, audio that stayed intelligible under a full crowd, and a control room a small permanent team could actually run.
The approach
How we engineered it.
We modelled the bowl acoustics before specifying loudspeakers, then designed a four-sided ribbon on a shared pixel map. Rigging, power and control were coordinated in one BIM model so the base build never had to be reopened.
The outcome
What it does now.
The ribbon runs as a single canvas across all four sides. STI improved across the upper tier, and the venue now changes match-day content from one operator position.
Gallery
The room, as built.



Next

